Road I-9 “Sunny Beach – Burgas” – constructing a second lane in the Pomorie – Aheloy roadway
Road I-9 “Sunny Beach – Burgas” – creating a second lane, from km 212+233.06 to km 217+000 in the Pomorie – Aheloy roadway.
Length of section – 2.4 km. Gauge – 20. Road Class – I. Crushed stone embankments – over 50,000 m3. Asphalt mixtures – over 30,000 tons laid. New channels, concrete drainage ditches, and retaining walls. Soundproofing fences – 2,8 km. Animal and amphibians fences – 2.1 km. Plus a number of additional operations. Value of the construction works completed – BGN 8.9 million. Construction category – I. The site was launched in June 2018.